Project description

UNITED SPORT completed the construction and installation of a five-a-side football field at the El Dabaa Nuclear Power Plant in Matrouh Governorate, covering a total area of 924 m².

The project involved the installation of Dutch artificial turf, including infill application, sports field markings, and final finishing works.

Project Implementation Stages

1. Site Preparation and Groundwork

Preparing the designated area for football field construction and ensuring the surface was ready for the installation of the artificial turf system.

2. Supply and Installation of Artificial Turf

Installing Dutch artificial turf, including turf laying, cutting, joining, and precise seam adjustments according to the field dimensions.

3. Infill System

Applying Silica Sand and SBR Rubber granules as infill materials to support the artificial turf fibers and help improve the performance of the playing surface.

4. Sports Line Marking

Installing five-a-side football field markings using white artificial turf, with accurate line positioning according to the field dimensions and approved sports layout.

5. Final Finishing Works

Inspecting turf seams, infill distribution, and field markings to ensure the quality and consistency of the finished sports surface.

Project Details

  • Project: Five-a-Side Football Field

  • Client: El Dabaa Nuclear Power Plant

  • Location: Matrouh, Egypt

  • Total Area: 924 m²

  • Turf Type: Dutch Artificial Turf

  • Infill System: Silica Sand + SBR Rubber Granules

  • Field Markings: White Artificial Turf Lines

Key highlights
924 m² Five-a-Side Football Field – Constructed at El Dabaa Nuclear Power Plant in Matrouh Governorate.
Dutch Artificial Turf – Used for the football field's playing surface.
Professional Ground Preparation – Preparing the field surface for the artificial turf system.
Artificial Turf Supply and Installation – Carried out according to the approved field dimensions and sports layout.
Precise Turf Laying, Cutting, and Joining – Ensuring a consistent playing surface.
Professional Joint and Seam Treatment – Providing a uniform sports surface.
Silica Sand Infill – Supporting artificial turf fibers and improving their stability.
SBR Rubber Infill – Helping enhance playing surface performance.
White Artificial Turf Field Markings – Installed according to the five-a-side football field dimensions.
Uniform Infill Distribution – Improving the stability and consistency of the playing surface.
Installation and Field Marking Quality Inspections – Ensuring accurate seams, proper markings, and even infill distribution.
Complete Final Finishing Works – Ensuring the football field is ready for sports activities.

Five-a-side football pitch

Five-a-side Football Pitch Project – El Dabaa Nuclear Power Plant, Marsa Matrouh

Project information
Location El Dabaa Nuclear Power Plant, Mersa Matrouh
Project area 924 m².
Category Stadiums
Execution duration Based on the scope of work

Quick contact